Recent examples of LCA consulting projects include:

Dallas County Community College District

Richland College richmond college

LCA completed a design of a new Convault® above ground storage tank fueling system to replace an existing underground fueling system, including detailed specifications in compliance with all local, state and federal regulations. The design included automatic tank gauging systems, fuel dispenser, and associated electrical and plumbing components. LCA assisted the DCCCD with contractor selection during the bid and with management of the construction. As CAS & CAPM of record, LCA directed work of a Class B contractor to decommission & remove the existing diesel and unleaded fueling system, dispenser and associated piping. LCA also completed and sealed the college’s Spill Prevention, Countermeasures and Control Plan (SPCCP) and completed the Release Determination Report (RDR) for TCEQ compliance.

Eastfield Collegeeastfield2

LCA completed a design of a new above ground storage tank fueling system to replace an existing underground fueling system, consisting of two 3000 gallon UL 142 ASTs, including detailed specifications in compliance with all local, state and federal regulations.

The design included automatic tank gauging systems, fuel dispenser, and associated electrical and plumbing components. LCA assisted the DCCCD with contractor selection during the bid and with management of the construction. As CAS & CAPM of record, LCA directed work of a Class B contractor to decommission & remove the existing diesel and unleaded fueling system, dispenser and associated piping. LCA also completed and sealed the college’s Spill Prevention, Countermeasures and Control Plan (SPCCP) and completed the Release Determination Report (RDR) for TCEQ compliance.

LBJ Freeway (Trinity Infrastructure)

Recent Projects

Environmental Compliance Manager for the Renovation of LBJ Freeway (Trinity Infrastructure) in Dallas, TX (5 year contract) – 2011 – 2015.

  • Project is 17 miles in length.
  • $3.5 billion to build, Dallas County.

Texas Department of Transportation

TxDOT Scientific Services Contract, includes Phase I and II, Environmental Site Assessment, Mitigation Plans, Asbestos Inspections and UST Removals – 2013-2015.

St. Joseph Hospital

Recent Projects

Environmental deconstruction of former St. Joseph Hospital, Fort Worth, TX (575,000 SF) – 2011-2012.

  • Wrote RFP for Tarrant County Hospital District.
  • Managed asbestos abatement demolition.
  • Achieved 95% recycling of building materials.

 

Eagle Mountain Dam and Levee & Richland Chambers Dam

Recent projects

Eagle Mountain Dam and Levee and Richland Chambers Dam for Phase I Forensic Inspection; Pumping Tests and Hydrologic Analysis in support of Transient Model for Maximum Probable Flood Impact and estimate of dam and levee structure remaining life span; 2008 – 2012.